Solar · United Kingdom
One Central Boulevard, Central Boulevard - Solar Panels
Operator Frasers Property
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 7 October 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
One Central Boulevard, Central Boulevard - Solar Panels is a 0.2 MW solar farm on the edge of Dorridge, West Midlands, United Kingdom. Its planning application (PL/2022/01629/PNSVP) went to Solihull on 8 August 2022 and was granted on 27 September 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 48 other energy sites within 10 km, 34 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when One Central Boulevard, Central Boulevard - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for One Central Boulevard, Central Boulevard - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 12 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1272 | 2022 | Fire in solar panel distribution board at Birmingham college | 12 km | Minor |
| EIR-2523 | 2020 | Suspected solar panel fault sparks roof fire at Ombersley home | 32 km | Significant |
| EIR-2151 | 2018 | Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge | 58 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Frasers Property
- Location
- One Central Boulevard Central Boulevard Shirley, West Midlands, B90 8BG, United Kingdom
- Planning authority
- Solihull
- Planning application
- PL/2022/01629/PNSVP
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PL/2022/01629/PNSVP, with what the planning evidence pack adds for this site.
Every application in Solihull · Alerts for applications and incidents near here
Timeline
- 8 August 2022 Planning application submitted
- 27 September 2022 Planning permission granted
- 6 September 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names One Central Boulevard, Central Boulevard - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has One Central Boulevard, Central Boulevard - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names One Central Boulevard, Central Boulevard - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of One Central Boulevard, Central Boulevard - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 October 2022.
- Where is One Central Boulevard, Central Boulevard - Solar Panels?
- On the edge of Dorridge, West Midlands, United Kingdom (postcode B90 8BG).