Solar · United Kingdom
Barton Dock Road, Trafford Park - Solar Panels
Operator Williams Motor Company Limited
Application Refused0.3 MWData checked 16 November 2026Source record dated 9 December 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Barton Dock Road, Trafford Park - Solar Panels is a 0.3 MW solar farm on the edge of Urmston, Greater Manchester, United Kingdom. Its planning application (117215/PRJ/25) went to Trafford on 3 September 2025 and was refused on 28 October 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 131 other energy sites within 10 km, 72 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Barton Dock Road, Trafford Park - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Williams Motor Company Limited
- Location
- 20 - 22 Barton Dock Road, Trafford Park, Manchester, Greater Manchester, M41 7GF, United Kingdom
- Planning authority
- Trafford
- Planning application
- 117215/PRJ/25
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 117215/PRJ/25, with what the planning evidence pack adds for this site.
Every application in Trafford · Alerts for applications and incidents near here
Timeline
- 3 September 2025 Planning application submitted
- 28 October 2025 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Barton Dock Road, Trafford Park - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Barton Dock Road, Trafford Park - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Barton Dock Road, Trafford Park - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Barton Dock Road, Trafford Park - Solar Panels?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 9 December 2025.
- Where is Barton Dock Road, Trafford Park - Solar Panels?
- On the edge of Urmston, Greater Manchester, United Kingdom (postcode M41 7GF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).