Onshore wind · United Kingdom
Barony Road
Operator Private Developer
Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 19 May 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Barony Road is a 0.3 MW wind farm 18 km west of Cookstown, Co. Tyrone, United Kingdom. Its planning application (LA10/2019/0323/F) went to Fermanagh and Omagh on 11 March 2019 and was granted on 24 June 2019. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 24 other energy sites within 10 km, 21 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Barony Road changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Barony Road sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1038, Wind turbine reported to have collapsed in Northern Ireland during severe storm, 9.1 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1038 | 2017 | Wind turbine reported to have collapsed in Northern Ireland during severe storm | 9.1 km | Significant |
| EIR-0422 | 2025 | Wind turbine fire prompts fire service response in Fermanagh | 45 km | Minor |
| EIR-1134 | 2017 | Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire | 151 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Private Developer
- Location
- 230 Barony Road, Creggan, Omagh, Co Tyrone, Co. Tyrone, BT79 9AQ, United Kingdom
- Planning authority
- Fermanagh and Omagh
- Planning application
- LA10/2019/0323/F
- Turbines
- 1, 100 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA10/2019/0323/F, with what the planning evidence pack adds for this site.
Every application in Fermanagh and Omagh · Alerts for applications and incidents near here
Timeline
- 11 March 2019 Planning application submitted
- 24 June 2019 Planning permission granted
- 20 June 2022 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Barony Road. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Barony Road had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Barony Road; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Barony Road?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 May 2020.
- Where is Barony Road?
- 18 km west of Cookstown, Co. Tyrone, United Kingdom (postcode BT79 9AQ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).