Balls Wood Solar Farm is a 8.7 MW solar farm 4 km east of Plymstock, Devon, United Kingdom. Its planning application (07/1814/14/F) went to South Hams on 15 July 2014 and was granted on 14 October 2014. It has been operating since 15 December 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 51 other energy sites within 10 km, 37 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

167 energy sites within 40 km for Balls Wood Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
8.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Due South Energy & SunE Project6 Ltd
Location
Balls Wood, Plymouth, Devon, Devon, United Kingdom
Planning authority
South Hams
Planning application
07/1814/14/F
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 07/1814/14/F, with what the planning evidence pack adds for this site.

Every application in South Hams · Alerts for applications and incidents near here

  • 15 July 2014 Planning application submitted
  • 14 October 2014 Planning permission granted
  • 15 September 2015 Construction started
  • 15 December 2015 Operational

None found. The register holds no published incident that names Balls Wood Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Balls Wood Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Balls Wood Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Balls Wood Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 23 March 2016.
Where is Balls Wood Solar Farm?
4 km east of Plymstock, Devon, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).