Solar · United Kingdom

Baker Barracks Solar Development

Operator Defence Estates Infrastructure Organisation

Awaiting Construction1.5 MWData checked 16 November 2026Source record dated 11 January 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Baker Barracks Solar Development is a 1.5 MW solar farm 3.2 km south of Emsworth, Hampshire, United Kingdom. Its planning application (20/03047/FULEIA) went to Chichester on 24 November 2020 and was granted on 22 February 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 25 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Baker Barracks Solar Development sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2076, Fire across four homes in Leigh Park most likely linked to solar panel equipment, fire service says, 6.7 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20762020Fire across four homes in Leigh Park most likely linked to solar panel equipment, fire service says6.7 kmSignificant
EIR-15292023Fire contained to solar panels on Gosport flats roof14 kmMinor
EIR-20852020Fire involving solar panels at a house in Barnham, West Sussex20 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Defence Estates Infrastructure Organisation
Location
Baker Barracks, Emsworth Road, Emsworth, Hampshire, PO10 8DH, United Kingdom
Planning authority
Chichester
Planning application
20/03047/FULEIA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 20/03047/FULEIA, with what the planning evidence pack adds for this site.

Every application in Chichester · Alerts for applications and incidents near here

  • 24 November 2020 Planning application submitted
  • 22 February 2021 Planning permission granted
  • 22 February 2024 Planning permission expired

None found. The register holds no published incident that names Baker Barracks Solar Development. If you know of one, report it (confidential reports are anonymised).

Has Baker Barracks Solar Development had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Baker Barracks Solar Development; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Baker Barracks Solar Development?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 January 2022.
Where is Baker Barracks Solar Development?
3.2 km south of Emsworth, Hampshire, United Kingdom (postcode PO10 8DH).