← Back to California
Planning pack for this site, £295Other options

Solar · United States

Aurora Renewable Energy (Hybrid)

Operator Vesper Energy Development LLC

Planned50 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Aurora Renewable Energy (Hybrid) is a 50 MW solar farm 3.1 km north-west of West Modesto, Stanislaus County, California, United States. Its status in the U.S. Energy Information Administration, Form EIA-860M is planned. There are 5 other energy sites within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Aurora Renewable Energy (Hybrid) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 168 comparable solar incidents in the United States, nearest first. The nearest is EIR-1403, Vegetation fire burns nearly 60 acres on a solar farm near Jamestown, 69 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14032023Vegetation fire burns nearly 60 acres on a solar farm near Jamestown69 kmSignificant
EIR-24082024Rooftop solar fire forces evacuation of five-storey Sacramento building112 kmSignificant
EIR-12522021Napa Valley College solar field reported taken offline after leakage concern145 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 165 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
50 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Planned
Operator
Vesper Energy Development LLC
Owner
Vesper Energy Development LLC
Location
Stanislaus County, California, United States
Expected
2028
Balancing authority
BANC

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Aurora Renewable Energy (Hybrid). If you know of one, report it (confidential reports are anonymised).

Has Aurora Renewable Energy (Hybrid) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Aurora Renewable Energy (Hybrid); it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Aurora Renewable Energy (Hybrid)?
Planned, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Aurora Renewable Energy (Hybrid)?
3.1 km north-west of West Modesto, Stanislaus County, California, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).