← Back to Michigan

Solar · United States

Assembly Solar III

Operator Assembly Solar III, LLC

Operational79 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Assembly Solar III is a 79 MW solar farm 8.7 km south-west of Flushing, Shiawassee County, Michigan, United States. It first operated in 2022. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 3 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

14 energy sites within 40 km for Assembly Solar III

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
79 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Assembly Solar III, LLC
Owner
Assembly Solar III, LLC
Location
Shiawassee County, Michigan, United States
First operating
2022
Balancing authority
MISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Assembly Solar III. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Assembly Solar III had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Assembly Solar III; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Assembly Solar III?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Assembly Solar III?
8.7 km south-west of Flushing, Shiawassee County, Michigan, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).