Battery storage · United Kingdom

Arbroath 19MW 2hour BESS

Operator ARBROATH LIMITED · Owner Grid Holdco 1 Limited

Operational19 MWData checked 16 November 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Arbroath 19MW 2hour BESS is a 19 MW battery storage site on the edge of Arbroath, United Kingdom. Its status in the public dataset is operational. There are 30 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 3 other sites and 180 energy sites within 40 km for Arbroath 19MW 2hour BESS

Members see the sites and incidents around this one, and every record behind them.

ARBROATH LIMITED (12142520), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Battery)
Capacity
19 MW
Capacity figure from
Capacity Market register (EMR Delivery Body)
Status
Operational (Capacity Market unit, delivery year 2025, agreement awarded)
Operator
ARBROATH LIMITED
Owner
Grid Holdco 1 Limited
Location
DD11 2QH, United Kingdom

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Arbroath 19MW 2hour BESS. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Arbroath 19MW 2hour BESS had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Arbroath 19MW 2hour BESS; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Arbroath 19MW 2hour BESS?
Operational, in the public dataset.
Where is Arbroath 19MW 2hour BESS?
On the edge of Arbroath, United Kingdom (postcode DD11 2QH).

The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).