← Back to Angus
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Denfield - Battery Storage Facility

Operator Peter J Stirling Limited

Revised7 MWData checked 16 November 2026Source record dated 12 November 2024

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Denfield - Battery Storage Facility is a 7 MW battery storage site on the edge of Arbroath, Angus, United Kingdom. Its planning application (23/00706/FULL) went to Angus on 17 October 2023 and was withdrawn on 25 September 2024. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 30 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

PETER J STIRLING LIMITED (SC480340), active, since 2014. 7 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Denfield - Battery Storage Facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 354 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool354 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells396 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire542 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Peter J Stirling Limited
Location
200m W/O Denfield, Arbroath, Angus, DD11 2QH, United Kingdom
Planning authority
Angus
Planning application
23/00706/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/00706/FULL, with what the planning evidence pack adds for this site.

Every application in Angus · Alerts for applications and incidents near here

  • 17 October 2023 Planning application submitted
  • 25 September 2024 Application withdrawn

None found. The register holds no published incident that names Denfield - Battery Storage Facility. If you know of one, report it (confidential reports are anonymised).

Has Denfield - Battery Storage Facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Denfield - Battery Storage Facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Denfield - Battery Storage Facility?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 12 November 2024.
Where is Denfield - Battery Storage Facility?
On the edge of Arbroath, Angus, United Kingdom (postcode DD11 2QH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).