← Back to Texas

Solar · United States

Aragorn Solar Project

Operator SE Aragorn, LLC

Operational187 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Aragorn Solar Project is a 187 MW solar farm Culberson County, Texas, United States. It first operated in 2021. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There is one other energy site within 10 km. The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

7 energy sites within 40 km for Aragorn Solar Project

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
187 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
SE Aragorn, LLC
Owner
SE Aragorn, LLC
Location
Culberson County, Texas, United States
First operating
2021
Balancing authority
ERCO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Aragorn Solar Project. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Aragorn Solar Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Aragorn Solar Project; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Aragorn Solar Project?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Aragorn Solar Project?
Culberson County, Texas, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts.