Around this site

← Back to Anhui

Solar · China

Anhui Nanqiao Huangnigangzhen Dushan Reservoir solar farm

Planned (permitted)150 MWChecked 8 October 2026Last changed in the dataset 26 February 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Anhui Nanqiao Huangnigangzhen Dushan Reservoir solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Solar
Capacity
150 MW
Status
Planned (permitted) (Pre-construction)
Operator
RISEN (Ningbo) Electric POWER Development
Owner
Risen Energy Co Ltd [75%]; Risen Energy (Hong Kong) Co Ltd [25%]
Location
Huangnigang Town, Chuzhou, Anhui, China

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Anhui Nanqiao Huangnigangzhen Dushan Reservoir solar farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.