Solar · United Kingdom
Andover Solar Farm
Operator The Clark Trustees
Operational5 MWData checked 16 November 2026Source record dated 18 November 2013
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Andover Solar Farm is a 5 MW solar farm on the edge of Andover, Hampshire, United Kingdom. Its planning application (11/00529/FULLN) went to Test Valley on 1 March 2011 and was granted on 29 September 2011. It has been operating since 22 March 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 37 other energy sites within 10 km, 34 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Andover Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- The Clark Trustees
- Location
- Andover Business Park, Monxton Road, Andover, Hampshire, Hampshire, United Kingdom
- Planning authority
- Test Valley
- Planning application
- 11/00529/FULLN
- First operating
- 2013
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 11/00529/FULLN, with what the planning evidence pack adds for this site.
Every application in Test Valley · Alerts for applications and incidents near here
Timeline
- 1 March 2011 Planning application submitted
- 29 September 2011 Planning permission granted
- 22 March 2013 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Andover Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Andover Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Andover Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Andover Solar Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 November 2013.
- Where is Andover Solar Farm?
- On the edge of Andover, Hampshire, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).