AMPYR - KlimaVest solar farm

Operator AMPYR Solar Europe (ASE) · Owner Commerz Real AG [100%]

Cancelled201 MWData checked 8 October 2026Source record dated 30 October 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

AMPYR - KlimaVest solar farm is a 201 MW solar farm 14 km north-east of Eisenach, Unstrut-Hainich-Kreis, Thuringia, Germany. Its status in the Global Energy Monitor solar and wind trackers is cancelled. There are 28 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 8 incidents at solar farms (hybrid battery and solar sites included) in Germany, and 480 worldwide.

295 energy sites within 40 km for AMPYR - KlimaVest solar farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
201 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Cancelled
Operator
AMPYR Solar Europe (ASE)
Owner
Commerz Real AG [100%]
Location
Unstrut-Hainich, Unstrut-Hainich-Kreis, Thuringia, Germany
Phases in the tracker
3

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names AMPYR - KlimaVest solar farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has AMPYR - KlimaVest solar farm had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names AMPYR - KlimaVest solar farm; it holds 8 incidents at solar farms (hybrid battery and solar sites included) in Germany.
What is the status of AMPYR - KlimaVest solar farm?
Cancelled, in the Global Energy Monitor solar and wind trackers, where it last changed on 30 October 2025.
Where is AMPYR - KlimaVest solar farm?
14 km north-east of Eisenach, Unstrut-Hainich-Kreis, Thuringia, Germany.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).