← Back to Lancashire
Planning pack for this site, £295Other options

Solar · United Kingdom

Amazon UK Plot E1, Bridgewater Avenue - Solar photovoltaic panels

Operator Zestec Renewable Energy

Awaiting ConstructionData checked 16 November 2026Source record dated 19 April 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Amazon UK Plot E1, Bridgewater Avenue - Solar photovoltaic panels is a solar farm on the edge of Tyldesley, Lancashire, United Kingdom. Its planning application (13471/22) went to Bolton on 29 March 2022 and was granted on 9 June 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 55 other energy sites within 10 km, 33 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Amazon UK Plot E1, Bridgewater Avenue - Solar photovoltaic panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 5.9 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school5.9 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof54 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent55 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Zestec Renewable Energy
Location
Amazon Uk, Plot E1, Logistics North, Bridgewater Avenue, Bolton, Lancashire, BL5 1BT, United Kingdom
Planning authority
Bolton
Planning application
13471/22

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 13471/22, with what the planning evidence pack adds for this site.

Every application in Bolton · Alerts for applications and incidents near here

  • 29 March 2022 Planning application submitted
  • 9 June 2022 Planning permission granted
  • 9 June 2025 Planning permission expired

None found. The register holds no published incident that names Amazon UK Plot E1, Bridgewater Avenue - Solar photovoltaic panels. If you know of one, report it (confidential reports are anonymised).

Has Amazon UK Plot E1, Bridgewater Avenue - Solar photovoltaic panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Amazon UK Plot E1, Bridgewater Avenue - Solar photovoltaic panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Amazon UK Plot E1, Bridgewater Avenue - Solar photovoltaic panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 April 2022.
Where is Amazon UK Plot E1, Bridgewater Avenue - Solar photovoltaic panels?
On the edge of Tyldesley, Lancashire, United Kingdom (postcode BL5 1BT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).