Solar · Chile

Alto Bellavista Sunlight solar project

Operational8 MWData checked 8 October 2026Source record dated 1 December 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Alto Bellavista Sunlight solar project is a 8 MW solar farm 6.7 km south-east of Requínoa, Libertador Gral. Bernardo O’Higgins, Chile. It first operated in 2024. Its status in the Global Energy Monitor solar and wind trackers is operational. There are 3 other energy sites within 10 km. The register holds no incident at this site. It holds 3 incidents at solar farms (hybrid battery and solar sites included) in Chile, and 480 worldwide.

35 energy sites within 40 km for Alto Bellavista Sunlight solar project

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
8 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Operational (Operating)
Location
Requínoa, Libertador Gral. Bernardo O’Higgins, Chile
First operating
2024

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Alto Bellavista Sunlight solar project. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Alto Bellavista Sunlight solar project had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Alto Bellavista Sunlight solar project; it holds 3 incidents at solar farms (hybrid battery and solar sites included) in Chile.
What is the status of Alto Bellavista Sunlight solar project?
Operational, in the Global Energy Monitor solar and wind trackers, where it last changed on 1 December 2025.
Where is Alto Bellavista Sunlight solar project?
6.7 km south-east of Requínoa, Libertador Gral. Bernardo O’Higgins, Chile.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).