← Back to Bologna
Planning pack for this site, £295Other options

Solar · Italy

Altedo solar farm

Owner HF Solar 18 SRL

Planned (permitted)51.8 MWData checked 8 October 2026Source record dated 15 January 2026

Watch this siteIts incidents, owner and operator, in your workspace and by email. 7 days free, no card.

Altedo solar farm is a 51.8 MW solar farm 9.9 km south-east of San Pietro in Casale, Bologna, Italy. Its status in the Global Energy Monitor solar and wind trackers is planned (permitted). No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 24 incidents at solar farms (hybrid battery and solar sites included) in Italy, and 490 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Altedo solar farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 24 comparable solar incidents in Italy, nearest first. The nearest is EIR-1307, Fire at residential solar installation in Castelfranco Emilia, 37 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13072026Fire at residential solar installation in Castelfranco Emilia37 kmMinor
EIR-26902022Warehouse fire in Bertinoro spreads to rooftop solar panels75 kmMinor
EIR-27472026Solar panel fire forces evacuation of primary school in Prato87 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 21 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
51.8 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Planned (permitted) (Pre-construction)
Owner
HF Solar 18 SRL
Location
Baricella, Bologna, Italy

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Altedo solar farm. If you know of one, report it (confidential reports are anonymised).

Has Altedo solar farm had a fire or other incident?
None is on the register as of 26 November 2026. The register holds no published incident that names Altedo solar farm; it holds 24 incidents at solar farms (hybrid battery and solar sites included) in Italy.
What is the status of Altedo solar farm?
Planned (permitted), in the Global Energy Monitor solar and wind trackers, where it last changed on 15 January 2026.
Where is Altedo solar farm?
9.9 km south-east of San Pietro in Casale, Bologna, Italy.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).