← Back to Glasgow City

Solar · United Kingdom

Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array

Operator Scottish Water National Operations Control Centre

Operational0.2 MWData checked 16 November 2026Source record dated 25 February 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array is a 0.2 MW solar farm on the edge of High Blantyre, Glasgow City, United Kingdom. Its planning application (P/24/0118) went to South Lanarkshire on 2 February 2024 and was granted on 8 April 2024. It has been operating since 1 January 2025. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 66 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 10 other sites and 534 energy sites within 40 km for Allers Wastewater Treatment Works, Barrie Road - Solar Pv…

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Scottish Water National Operations Control Centre
Location
Allers Wastewater Treatment Works, Barrie Road, East Kilbride, Glasgow City, G74 3XZ, United Kingdom
Planning authority
South Lanarkshire
Planning application
P/24/0118
First operating
2025

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/24/0118, with what the planning evidence pack adds for this site.

Every application in South Lanarkshire · Alerts for applications and incidents near here

  • 2 February 2024 Planning application submitted
  • 8 April 2024 Planning permission granted
  • 1 September 2024 Construction started
  • 1 January 2025 Operational

None found. The register holds no published incident that names Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 25 February 2025.
Where is Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array?
On the edge of High Blantyre, Glasgow City, United Kingdom (postcode G74 3XZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).