Agua Caliente Solar Project

Operator Agua Caliente Solar · Owner First Solar Project Development (75%), Agua Caliente Solar (12.8%), MidAmerican Solar LLC (12.3%)

Operational348 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Agua Caliente Solar Project is a 348 MW solar farm Yuma County, Arizona, United States. It first operated in 2012. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 10 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

15 energy sites within 40 km for Agua Caliente Solar Project

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
348 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational; some generators cancelled or postponed
Operator
Agua Caliente Solar
Owner
First Solar Project Development (75%), Agua Caliente Solar (12.8%), MidAmerican Solar LLC (12.3%)
Location
Yuma County, Arizona, United States
First operating
2012
Balancing authority
CISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Agua Caliente Solar Project. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Agua Caliente Solar Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Agua Caliente Solar Project; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of Agua Caliente Solar Project?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Agua Caliente Solar Project?
Yuma County, Arizona, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts.