← Back to Florida

Solar · United States

AEP Jacksonville Solar Project

Operator Onsite Partners, LLC

Operational7.1 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

AEP Jacksonville Solar Project is a 7.1 MW solar farm 12 km east of Nassau Village-Ratliff, Duval County, Florida, United States. It first operated in 2017. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 3 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.

The operator's 32 other sites and 54 energy sites within 40 km for AEP Jacksonville Solar Project

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
7.1 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Onsite Partners, LLC
Owner
Onsite Partners, LLC
Location
Duval County, Florida, United States
First operating
2017
Balancing authority
JEA

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names AEP Jacksonville Solar Project. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has AEP Jacksonville Solar Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names AEP Jacksonville Solar Project; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
What is the status of AEP Jacksonville Solar Project?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is AEP Jacksonville Solar Project?
12 km east of Nassau Village-Ratliff, Duval County, Florida, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).