Solar · United Kingdom
Advent Way - Solar Panels
Operator Big Yellow Group Plc
Operational0.2 MWData checked 16 November 2026Source record dated 11 January 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Advent Way - Solar Panels is a 0.2 MW solar farm on the edge of Edmonton, London, United Kingdom. Its planning application (21/03444/PRV) went to Enfield on 7 September 2021 and was granted on 1 November 2021. It has been operating since 1 December 2021. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 74 other energy sites within 10 km, 58 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Advent Way - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
BIG YELLOW GROUP PLC (03625199), active, since 1998. 11 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Big Yellow Group Plc
- Location
- 8 Advent Way, London, N18 3AF, United Kingdom
- Planning authority
- Enfield
- Planning application
- 21/03444/PRV
- First operating
- 2021
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 21/03444/PRV, with what the planning evidence pack adds for this site.
Every application in Enfield · Alerts for applications and incidents near here
Timeline
- 7 September 2021 Planning application submitted
- 1 November 2021 Planning permission granted
- 1 November 2021 Construction started
- 1 December 2021 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Advent Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Advent Way - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Advent Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Advent Way - Solar Panels?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 11 January 2022.
- Where is Advent Way - Solar Panels?
- On the edge of Edmonton, London, United Kingdom (postcode N18 3AF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).