← Back to London

Energy sites / United Kingdom / London

Solar · United Kingdom

Advent Way - Solar Panels

Operational0.2 MWChecked 6 October 2026Last changed in the dataset 11 January 2022

Technology
Solar
Capacity
0.2 MW
Status
Operational
Operator or applicant
Big Yellow Group Plc
Location
8 Advent Way, London, N18 3AF, United Kingdom
Planning authority
Enfield
Planning application
21/03444/PRV
First operating
2021

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 7 September 2021 Planning application submitted
  • 1 November 2021 Planning permission granted
  • 1 November 2021 Construction started
  • 1 December 2021 Operational

None found. The register holds no published incident that names Advent Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.