On Monday evening at the Terra-Gen Energy Storage System in Valley Center, the emergency management system detected a smoke alarm in one battery storage unit. The Valley Center Fire Department and the San Diego County Hazardous Materials Division responded...
Terra-Gen
Named in a role in 4 records, between 2022 and 2026.
Being named is not a finding of fault. Counts are of records in published reporting, not rates, and the company's role is the one the sources give.
Work at Terra-Gen? See every record that names it, free, and ask for a correction or add your side.
Records naming this company
Free entries that mention Terra-Gen
A lithium-ion battery energy storage system at the Edwards Sanborn E2 site in Kern County, California, operated by Terra-Gen, experienced a failure incident in February 2024, according to an industry database that tracks stationary battery storage failures....
In September 2023, a fire occurred in the late afternoon at the Valley Center Energy Storage System in Valley Center, San Diego County, California, operated by Terra-Gen. Fire and sheriff's departments were dispatched, roads in the area were closed, an...
See what failed, why, and what it cost
The record behind each entry: the manufacturer, integrator and operator, root cause, failure mode, downtime, losses and every source.
A small electrical failure occurred within a single battery module at the Valley Center Battery Storage Project, a recently commissioned lithium-ion battery energy storage facility in Valley Center, San Diego County, California, operated and owned by...
What this page is, and what it is not
It counts the records in this register that name this company in any role. Being named is not a finding of fault. Most incidents have several contributing causes, and the company named as manufacturer, integrator, operator or contractor is often not the cause of what went wrong.
Counts reflect what public reporting names, so a company with a large installed base, or one operating where reporting is open, will appear more often than a company of the same size elsewhere. Read the counts alongside the note on coverage in the methodology.
If you work for this company and something here is wrong, tell us and we will correct it. Use the corrections page: we acknowledge within 2 working days and decide within 10.