On a Tuesday night, reported as about 9:20pm and most likely 30 November 2021, a failed transformer caught fire at the Watts Bar Nuclear Plant operated by the Tennessee Valley Authority. The source identifies the fire as being in the Unit 2 main bank...
Tennessee Valley Authority
Named in a role in 1 record, and mentioned in the text of 2 entries, in 2016.
Being named is not a finding of fault. Counts are of records in published reporting, not rates, and the company's role is the one the sources give.
Work at Tennessee Valley Authority? See every record that names it, free, and ask for a correction or add your side.
Records naming this company
Free entries that mention Tennessee Valley Authority
On 30 August 2016, an electrical fault on the 2B main bank transformer at Tennessee Valley Authority's Watts Bar Unit 2 caused the main turbine to trip. The reactor also tripped by design. The fault led to an oil fire in an exterior switchyard transformer,...
What this page is, and what it is not
It counts the records in this register that name this company in any role. Being named is not a finding of fault. Most incidents have several contributing causes, and the company named as manufacturer, integrator, operator or contractor is often not the cause of what went wrong.
Counts reflect what public reporting names, so a company with a large installed base, or one operating where reporting is open, will appear more often than a company of the same size elsewhere. Read the counts alongside the note on coverage in the methodology.
If you work for this company and something here is wrong, tell us and we will correct it. Use the corrections page: we acknowledge within 2 working days and decide within 10.