A news headline dated 28 May 2024 said a Suzlon wind turbine in Jaisalmer was engulfed in flames, and linked the fire to extreme temperature. The article body could not be retrieved, and no further report was found. Injuries, the extent of damage and a...
Suzlon
Named in a role in 3 records, between 2014 and 2024.
Being named is not a finding of fault. Counts are of records in published reporting, not rates, and the company's role is the one the sources give.
Work at Suzlon? See every record that names it, free, and ask for a correction or add your side.
Records naming this company
Free entries that mention Suzlon
Three Suzlon S88 2.1MW turbines at the Amayo II plant, part of the 63MW Amayo wind complex owned by AEI Energy in Rivas municipality, Nicaragua, malfunctioned in high winds in the early hours of a Sunday morning, about an hour after a power blackout hit the...
On 14 March 2011, the rotor and three large blades detached from one turbine tower at the Rugby wind farm, near Rugby, North Dakota, and fell to the ground. The site, operated by Iberdrola Renewables Inc., has 71 turbines and a capacity of up to 149...
What this page is, and what it is not
It counts the records in this register that name this company in any role. Being named is not a finding of fault. Most incidents have several contributing causes, and the company named as manufacturer, integrator, operator or contractor is often not the cause of what went wrong.
Counts reflect what public reporting names, so a company with a large installed base, or one operating where reporting is open, will appear more often than a company of the same size elsewhere. Read the counts alongside the note on coverage in the methodology.
If you work for this company and something here is wrong, tell us and we will correct it. Use the corrections page: we acknowledge within 2 working days and decide within 10.