← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Denbighshire

Tir Mostyn And Foel Goch Wind Farm

Operational21.3 MWApplication 25/710/99/PFSubmitted 22 September 1999Granted 19 December 2002

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
25/710/99/PF
Planning authority
Denbighshire
County or area
Clwyd
Nation
Wales
Technology
Onshore wind
Capacity
21.3 MW
Status
Operational
Operator or applicant
Munich Re (previously Windjen Power Ltd)
Location
Nantglyn, Denbighshire
Turbines
25
First operating
2005
  • 22 September 1999 Planning application submitted
  • 19 December 2002 Planning permission granted
  • 1 June 2005 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0732, Nordex turbine damaged by suspected lightning strike at UK wind farm, 92 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07322026Nordex turbine damaged by suspected lightning strike at UK wind farm92 kmMinor
EIR-07902022Nordex attributes a Welsh wind turbine collapse to an overspeed condition93 kmMajor
EIR-16242026Crane topples on Scout Moor wind farm project103 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Tir Mostyn And Foel Goch Wind Farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Denbighshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.