Planning application · Solar · South Gloucestershire

Rolls Royce Filton Campus Building 185

Operational1.8 MWApplication PT16/0447/FSubmitted 29 January 2016Granted 23 March 2016

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
PT16/0447/F
Planning authority
South Gloucestershire
County or area
Avon
Nation
England
Technology
Solar
Capacity
1.8 MW
Status
Operational
Operator or applicant
Innogy (previously BELECTRIC Solar)
Location
Rolls Royce Filton Campus Buil, 184 Gloucester Road, Patchway, Bristol, BS34 6QA
First operating
2016
  • 29 January 2016 Planning application submitted
  • 23 March 2016 Planning permission granted
  • 25 May 2016 Construction started
  • 15 August 2016 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1416, Fire at Bristol hospital started in solar panels, 9.1 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14162025Fire at Bristol hospital started in solar panels9.1 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol9.1 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol9.3 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near BS34 6QA is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in South Gloucestershire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.