← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Ceredigion

Monachty Bach, Pennant - Solar Panels

Awaiting Construction0.4 MWApplication A250403Submitted 11 June 2025Granted 8 August 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
A250403
Planning authority
Ceredigion
County or area
Dyfed
Nation
Wales
Technology
Solar
Capacity
0.4 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
J C Owen
Location
Monachty Bach, Pennant, Llanon, SY23 5JP
  • 11 June 2025 Planning application submitted
  • 8 August 2025 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1551, Fire involving solar panels on a garage roof in Shropshire, 101 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15512019Fire involving solar panels on a garage roof in Shropshire101 kmMinor
EIR-15472025Small fire within a solar panel at a house in Shropshire114 kmMinor
EIR-15502021Small fire involving solar panels at a property in Clun114 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near SY23 5JP is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Ceredigion.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.