← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · South Norfolk

Marsh Lane Solar Farm, Lion Road - Solar Farm

Awaiting Construction30 MWApplication DC/23/05426Submitted 4 December 2023Granted 13 August 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
DC/23/05426
Planning authority
South Norfolk
County or area
Norfolk
Nation
England
Technology
Solar
Capacity
30 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Aura Power Storage Solutions
Location
Marsh Lane Solar Farm At Land North Of Lion Road Palgrave, Diss, IP22 4GT
  • 4 December 2023 Planning application submitted
  • 13 August 2025 Planning permission granted
  • 13 August 2028 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2223, Homeowners allege solar panel fault caused Tolleshunt Knights house fire, 68 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-22232023Homeowners allege solar panel fault caused Tolleshunt Knights house fire68 kmMajor
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium70 kmMinor
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers89 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near IP22 4GT is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in South Norfolk.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.