← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Stoke-on-Trent

Marlborough Works, High Street - Solar Panels

Awaiting Construction0.2 MWApplication 68025/FULSubmitted 24 May 2022Granted on appeal 21 June 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
68025/FUL
Planning authority
Stoke-on-Trent
County or area
Staffordshire
Nation
England
Technology
Solar
Capacity
0.2 MW
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Churchill China Plc
Location
Marlborough Works, High Street, Sandyford, ST6 5NZ
  • 24 May 2022 Planning application submitted
  • 21 June 2022 Planning permission granted
  • 21 June 2022 Planning permission refused
  • 21 June 2022 Appeal granted
  • 21 June 2025 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1485, Faulty solar panel wiring sparks house fire in Stoke-on-Trent, 3.6 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent3.6 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall6.8 kmMinor
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire26 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near ST6 5NZ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Stoke-on-Trent.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.