Planning application · Solar · Torfaen

Mamhilad Solar Farm

Operational5 MWApplication 15/P/00436Submitted 24 August 2015Granted 22 December 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
15/P/00436
Planning authority
Torfaen
County or area
Gwent
Nation
Wales
Technology
Solar
Capacity
5 MW
Status
Operational
Operator or applicant
Active Renewables
Location
Land South of Little Mill Brickworks, Little Mill, Pontypool, NP4 0HD
First operating
2020
  • 24 August 2015 Planning application submitted
  • 22 December 2015 Planning permission granted
  • 12 January 2020 Construction started
  • 12 February 2020 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1416, Fire at Bristol hospital started in solar panels, 41 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14162025Fire at Bristol hospital started in solar panels41 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol41 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol42 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near NP4 0HD is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Torfaen.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.