Planning application · Solar · Forest of Dean

Locquiers Farm, Plump Hill - Solar Farm

Awaiting Construction15.7 MWApplication P0980/21/FULSubmitted 24 May 2021Granted 15 December 2021

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
P0980/21/FUL
Planning authority
Forest of Dean
County or area
Gloucestershire
Nation
England
Technology
Solar
Capacity
15.7 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Opdenergy UK 3 Limited
Location
Locquiers Farm Plump Hill Mitcheldean, GL17 0HQ
  • 24 May 2021 Planning application submitted
  • 15 December 2021 Planning permission granted
  • 15 December 2024 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2109, Solar installer falls through fragile farm roof at Kemble, suffering brain injuries, 39 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries39 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire42 kmSignificant
EIR-14162025Fire at Bristol hospital started in solar panels46 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near GL17 0HQ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Forest of Dean.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.