Planning application · Solar · Breckland
Kenninghall Solar / Hazeldick Solar
Operational8 MWApplication 3PL/2012/1088/FSubmitted 17 October 2012Granted on appeal 24 September 2014
The application
- Application number
- 3PL/2012/1088/F
- Planning authority
- Breckland
- County or area
- Norfolk
- Nation
- England
- Technology
- Solar
- Capacity
- 8 MW
- Status
- Operational
- Operator or applicant
- Norfolk Renewables
- Location
- Land to the west of Kenninghall, NR16 2EH
- Appeal reference
- APP/F2605/W/13/2211560
- First operating
- 2015
Timeline
- 17 October 2012 Planning application submitted
- 3 October 2013 Planning permission refused
- 10 January 2014 Appeal lodged
- 24 September 2014 Planning permission granted
- 24 September 2014 Appeal granted
- 1 January 2015 Construction started
- 31 March 2015 Operational
Preview of the planning evidence pack for this site
The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1262, Fire reported on solar-panel roof at Fitzwilliam College auditorium, 64 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1262 | 2024 | Fire reported on solar-panel roof at Fitzwilliam College auditorium | 64 km | Minor |
| EIR-2223 | 2023 | Homeowners allege solar panel fault caused Tolleshunt Knights house fire | 72 km | Major |
| EIR-1155 | 2024 | Rooftop solar fire contained on a Peterborough warehouse roof | 85 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packWhat the planning evidence pack adds for this application
The pack is made for Kenninghall Solar / Hazeldick Solar from the register and the government planning database: every comparable incident, nearest first, with its sources; the schemes refused, withdrawn or taken to appeal within 40 km, your council first; and the fire service guidance each incident bears on. One fixed, dated file, as a PDF, a web page and a Word document.
- Incidents within 50 km
- •••
- Nearest recorded incident
- ••••••
- UK grid-scale incidents, with NFCC notes
- ••••
- Schemes refused within 40 km
- •••
- Nearest refused scheme
- ••••••••••••
- Appeals within 40 km
- •••
- Decisions in Breckland
- ••••••••
- Sites of a similar size, worldwide
- ••••
- NFCC guidance points
- ••••••••
- Sources and citations
- ••••••••••
Launch price: £145 until 31 October (normally £295). By email in minutes. The order form arrives filled in from this application.
Alerts for applications near here
An email when another battery, solar or wind application near NR16 2EH is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.
By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.
Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.
The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Breckland.
Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.