Planning application · Solar · Tendring

Hartley Wood Farm - Solar Farm

Awaiting Construction22.5 MWApplication 22/00518/FULSubmitted 22 March 2022Granted 25 August 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
22/00518/FUL
Planning authority
Tendring
County or area
Essex
Nation
England
Technology
Solar
Capacity
22.5 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Bluefield Renewable Developments Limited/Anglo Renewables
Location
Hartley Wood Farm, Rectory Road, Weeley, Clacton on Sea, CO16 9BL
  • 22 March 2022 Planning application submitted
  • 25 August 2022 Planning permission granted
  • 25 August 2027 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2223, Homeowners allege solar panel fault caused Tolleshunt Knights house fire, 23 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-22232023Homeowners allege solar panel fault caused Tolleshunt Knights house fire23 kmMajor
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers41 kmMinor
EIR-15302023Electrical fault causes solar panel fire in Wickford house48 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CO16 9BL is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Tendring.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.