← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · South Gloucestershire

Hare Brewery - Solar Panels

Operational0.3 MWApplication P19/8584/PNRESubmitted 5 July 2019Granted 8 August 2019

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
P19/8584/PNRE
Planning authority
South Gloucestershire
County or area
Gloucestershire
Nation
England
Technology
Solar
Capacity
0.3 MW
Status
Operational
Operator or applicant
St Austell Brewery
Location
Southway Drive, Warmley, Bristol, BS30 5LW
First operating
2024
  • 5 July 2019 Planning application submitted
  • 8 August 2019 Planning permission granted
  • 30 January 2024 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2065, Loft fire believed caused by a solar panel at Paintworks flats in Bristol, 7.2 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol7.2 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels8.2 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol8.2 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near BS30 5LW is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in South Gloucestershire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.