Planning application · Onshore wind · Argyll and Bute

Glasvaar Wind Farm

Awaiting Construction49.5 MWApplication 22/01380/PPSubmitted 28 September 2022Granted 20 December 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
22/01380/PP
Planning authority
Argyll and Bute
County or area
Argyll And Bute
Nation
Scotland
Technology
Onshore wind
Capacity
49.5 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
E Power Limited
Location
Sidh Mor S/o Lochan Anama & Nw/o A-Chruach Wind Farm, Kilmichael Forest, PA28
Turbines
11, 149.9 m to tip
  • 28 September 2022 Planning application submitted
  • 20 December 2024 Planning permission granted
  • 20 December 2029 Planning permission expired Date as recorded in the register

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1951, Investigation begins after turbine fire at Ardrossan wind farm, 112 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-19512022Investigation begins after turbine fire at Ardrossan wind farm112 kmSignificant
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm113 kmSignificant
EIR-11572026Fire destroys turbine at Whitelee windfarm near Glasgow122 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near PA28 is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Argyll and Bute.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.