← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Braintree

Four Elms Solar Array

Operational0.2 MWApplication 20/01631/FULSubmitted 1 October 2020Granted 1 February 2021

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
20/01631/FUL
Planning authority
Braintree
County or area
Essex
Nation
England
Technology
Solar
Capacity
0.2 MW
Status
Operational
Operator or applicant
F H Nash Limited
Location
Factory R/o Four Elms, Bardfield Road, Bardfield, Braintree, CM7 5EJ
First operating
2021
  • 1 October 2020 Planning application submitted
  • 1 February 2021 Planning permission granted
  • 1 September 2021 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2223, Homeowners allege solar panel fault caused Tolleshunt Knights house fire, 27 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-22232023Homeowners allege solar panel fault caused Tolleshunt Knights house fire27 kmMajor
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers33 kmMinor
EIR-15302023Electrical fault causes solar panel fire in Wickford house35 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CM7 5EJ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Braintree.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.