← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Birmingham

Fort Shopping Park, Fort Parkway - Solar PV Panels

Awaiting Construction1.6 MWApplication 2023/05348/PASubmitted 17 August 2023Granted 21 September 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
2023/05348/PA
Planning authority
Birmingham
County or area
West Midlands
Nation
England
Technology
Solar
Capacity
1.6 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Ire Evaf Ii The Fort Propco Limited
Location
Fort Shopping Park, 20 Fort Parkway, Bromford, B24 9FP
  • 17 August 2023 Planning application submitted
  • 21 September 2023 Planning permission granted
  • 21 September 2026 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 4.1 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college4.1 kmMinor
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge54 kmSignificant
EIR-15472025Small fire within a solar panel at a house in Shropshire58 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near B24 9FP is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Birmingham.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.