← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Liverpool

Estuary Boulevard - Solar Panels

Awaiting Construction0.6 MWApplication 24PS/0253Submitted 31 January 2024Granted 25 March 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
24PS/0253
Planning authority
Liverpool
County or area
Merseyside
Nation
England
Technology
Solar
Capacity
0.6 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Columbia Threadneedle Investments Limited
Location
25 Estuary Boulevard, Liverpool, L24 8RF
  • 31 January 2024 Planning application submitted
  • 25 March 2024 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 29 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school29 kmSignificant
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire55 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent56 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near L24 8RF is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Liverpool.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.