← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Basildon

Endeavour Point, Endeavour Drive - Solar PV Panels

Application Submitted0.5 MWApplication 24/01361/PVPASubmitted 21 November 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
24/01361/PVPA
Planning authority
Basildon
County or area
Essex
Nation
England
Technology
Solar
Capacity
0.5 MW
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Indurent PropCo B7 Limited
Location
Endeavour Point, Endeavour Drive, Basildon, SS14 3WF
  • 21 November 2024 Planning application submitted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1530, Electrical fault causes solar panel fire in Wickford house, 4.3 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15302023Electrical fault causes solar panel fire in Wickford house4.3 kmMinor
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers11 kmMinor
EIR-22232023Homeowners allege solar panel fault caused Tolleshunt Knights house fire32 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near SS14 3WF is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Basildon.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.