← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Exeter

Emperor House, Grenadier Road - Solar Panels & Car Park Replacement

Awaiting Construction0.5 MWApplication 23/1223/FULSubmitted 6 December 2023Granted 29 August 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
23/1223/FUL
Planning authority
Exeter
County or area
Devon
Nation
England
Technology
Solar
Capacity
0.5 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Oxygen House Limited
Location
S/O Oxygen House & N/O Emperor House, Grenadier Road, Exeter, EX1 3LH
  • 6 December 2023 Planning application submitted
  • 29 August 2025 Planning permission granted
  • 29 August 2028 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1486, Fire under solar panels at Broadclyst brought under control, 4.2 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14862026Fire under solar panels at Broadclyst brought under control4.2 kmSignificant
EIR-14682026Solar panels involved in fire that destroyed a Sidmouth bungalow17 kmMajor
EIR-15232026Fire damages solar panel batteries in a Teignmouth garage19 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near EX1 3LH is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Exeter.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.