Planning application · Offshore wind · The Planning Inspectorate - National Infrastructure
East Anglia 1 (EA 1)
Operational714 MWApplication ENO10025Submitted 21 November 2012Granted 17 June 2014
The application
- Application number
- ENO10025
- Planning authority
- The Planning Inspectorate - National Infrastructure
- County or area
- Offshore
- Nation
- England
- Technology
- Offshore wind
- Capacity
- 714 MW
- Status
- Operational
- Operator or applicant
- Scottish Power Renewables
- Location
- Offshore, East of England, NR32
- Turbines
- 102
- First operating
- 2020
Timeline
- 21 November 2012 Planning application submitted
- 17 June 2014 Planning permission granted
- 24 May 2018 Construction started
- 28 July 2020 Operational
Preview of the planning evidence pack for this site
The pack for this site lists 11 comparable offshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0447, Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023, 60 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0447 | 2023 | Fire destroyed turbine at Scroby Sands Offshore Wind Farm in 2023 | 60 km | Major |
| EIR-0758 | 2024 | Service vessel collision damages turbine at Orsted's Hornsea Project One offshore wind farm | 392 km | Significant |
| EIR-1778 | 2018 | Engineer loses arm during repair at North Sea Siemens Gamesa turbine | 392 km | Major |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 8 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packWhat the planning evidence pack adds for this application
The pack is made for East Anglia 1 (EA 1) from the register and the government planning database: every comparable incident, nearest first, with its sources; the schemes refused, withdrawn or taken to appeal within 40 km, your council first; and the fire service guidance each incident bears on. One fixed, dated file, as a PDF, a web page and a Word document.
- Incidents within 50 km
- •••
- Nearest recorded incident
- ••••••
- UK grid-scale incidents, with NFCC notes
- ••••
- Schemes refused within 40 km
- •••
- Nearest refused scheme
- ••••••••••••
- Appeals within 40 km
- •••
- Decisions in The Planning Inspectorate - National Infrastructure
- ••••••••
- Sites of a similar size, worldwide
- ••••
- NFCC guidance points
- ••••••••
- Sources and citations
- ••••••••••
Launch price: £145 until 31 October (normally £295). By email in minutes. The order form arrives filled in from this application.
Alerts for applications near here
An email when another battery, solar or wind application near NR32 is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.
By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.
Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.
The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in The Planning Inspectorate - National Infrastructure.
Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.