← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Chichester

Chichester College, Westgate Fields - Solar Panels

Awaiting Construction0.4 MWApplication 24/02881/PA14JSubmitted 2 January 2025Granted 25 February 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
24/02881/PA14J
Planning authority
Chichester
County or area
West Sussex
Nation
England
Technology
Solar
Capacity
0.4 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Green Nation Solar Energy
Location
Chichester College, PO19 1SB
  • 2 January 2025 Planning application submitted
  • 25 February 2025 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2085, Fire involving solar panels at a house in Barnham, West Sussex, 10.0 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20852020Fire involving solar panels at a house in Barnham, West Sussex10.0 kmMinor
EIR-14222025Firefighters tackle solar panel fire in Yapton12 kmMinor
EIR-20762020Fire across four homes in Leigh Park most likely linked to solar panel equipment, fire service says15 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near PO19 1SB is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Chichester.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.