← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Powys

Cemmaes 3 Wind Farm

Appeal Withdrawn24 MWApplication P/2008/0249Submitted 29 February 2008Appeal withdrawn 22 October 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
P/2008/0249
Planning authority
Powys
Nation
Wales
Technology
Onshore wind
Capacity
24 MW
Status
Appeal Withdrawn
Operator or applicant
Acciona Energy
Location
east of Cwm Llinau on Mynydd Y Cemmaes ,AES, Llanbrynmair, Powys, SY19
Turbines
12
  • 29 February 2008 Planning application submitted
  • 22 January 2013 Planning permission refused
  • 4 March 2014 Appeal lodged
  • 22 October 2015 Appeal withdrawn

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0790, Nordex attributes a Welsh wind turbine collapse to an overspeed condition, 33 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07902022Nordex attributes a Welsh wind turbine collapse to an overspeed condition33 kmMajor
EIR-08742026Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales86 kmSignificant
EIR-07942022Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch110 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near SY19 is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Powys.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.