Planning application · Onshore wind · Denbighshire

Brenig Wind Farm

Operational37.6 MWApplication 25/2015/0636Submitted 18 June 2015Granted on appeal 18 May 2016

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
25/2015/0636
Planning authority
Denbighshire
Nation
Wales
Technology
Onshore wind
Capacity
37.6 MW
Status
Operational
Operator or applicant
CGNEE
Location
Land east of Llyn Brenig, Nantglyn, Denbigh
Appeal reference
APP/R6830/A/15/3141249
Turbines
16, 110 m to tip
First operating
2018
  • 18 June 2015 Planning application submitted
  • 19 November 2015 Planning permission refused
  • 27 January 2016 Appeal lodged
  • 18 May 2016 Planning permission granted
  • 18 May 2016 Appeal granted
  • 24 August 2017 Construction started
  • 15 October 2018 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0790, Nordex attributes a Welsh wind turbine collapse to an overspeed condition, 92 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07902022Nordex attributes a Welsh wind turbine collapse to an overspeed condition92 kmMajor
EIR-07322026Nordex turbine damaged by suspected lightning strike at UK wind farm93 kmMinor
EIR-16242026Crane topples on Scout Moor wind farm project104 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Brenig Wind Farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Denbighshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.