Planning application · Battery storage · Stroud

Arlingham Solar Farm - Solar PV Panels & Battery Storage Facility

Application Withdrawn49.9 MWApplication S.22/1371/FULSubmitted 30 June 2022Withdrawn 15 December 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
S.22/1371/FUL
Planning authority
Stroud
County or area
Gloucestershire
Nation
England
Technology
Battery storage (Co-located with RE)
Capacity
49.9 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Kronos Solar
Location
Milton End Farm Arlingham, GL2 7JH
  • 30 June 2022 Planning application submitted
  • 15 December 2022 Application withdrawn

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 34 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire34 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter139 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth, caused by a short circuit in NMC cells171 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near GL2 7JH is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Stroud.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.