← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Angus

Arbikie Wind Cluster

Application Withdrawn2.4 MWApplication 13/01069/EIALSubmitted 9 December 2013Withdrawn 18 December 2014

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
13/01069/EIAL
Planning authority
Angus
County or area
Tayside
Nation
Scotland
Technology
Onshore wind
Capacity
2.4 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Tellus Energy Ltd
Location
Land 900M West Of Rossie School Mountboy Montrose
Turbines
3
  • 9 December 2013 Planning application submitted
  • 18 December 2014 Application withdrawn

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1386, Wind turbine fire near St Cyrus in Aberdeenshire, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13862022Wind turbine fire near St Cyrus in Aberdeenshire14 kmMinor
EIR-04412025Wind turbine collapses at Aviva's Pitheavlis site in Perth61 kmSignificant
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm95 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Arbikie Wind Cluster is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Angus.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.