Transformer fault cuts power to Binghamton residential tower
Aug 2022Published 3 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on grid infrastructure incidents in the United States, and an email when EIR-1936 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): NYSEG
What happened
Electric service to a 15-storey residential building at 100 Chenango Place in downtown Binghamton was lost after a reported transformer blast on Chenango Street near the bus station. Residents said they heard a loud boom before the power failed at about 12:20 a.m. An on-site generator provided limited supply and kept one of the building's two lifts running. NYSEG said the outage was caused by a faulted elbow connecting the conductor to an underground transformer. The event affected 639 customers at first, later reduced to 173 after the fault was sectionalised.
Contributing factors
NYSEG attributed the outage to a faulted elbow on an underground transformer. A transformer vault explosion had occurred nearby less than three weeks earlier; the utility said the two events were not related. The precise failure mechanism beyond the faulted elbow was not reported.
Lessons learned
- Underground transformer elbows and conductor connections need inspection and maintenance, because a single faulted joint can drop supply to a high-rise and neighbouring customers.
- Sectionalising can sharply cut the number of customers affected by one underground fault.
- Backup generation in tall residential buildings should be able to support essential services, such as at least one lift, during a utility outage.
More lessons on electrical protection and isolation, outages, backup supply and restoration, from every incident on the register.
Source
Other entries that name Binghamton
Published 2026-10-03. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.