← Back to the list
Wind (onshore)AustraliaEIR-0939

Worker's hand amputated in machinery accident at Bango Wind Farm near Yass

Feb 2021Published 17 Sept 2026Responsible editor: Chief Editor

Estimated damageEstimated by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersMedium confidence
turbine out of service for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hidden
Where
Bango Wind Farm near Yass, New South Wales
Owner
CWP Renewables
What
Worker's hand severed on machinery
Injuries
Worker suffered severed hand
Response
SafeWork NSW opened investigation

Companies named in the reporting of this entry (being named is not a finding of fault): CWP Renewables

A worker at the Bango Wind Farm construction site on Lachlan Valley Way near Yass, New South Wales, suffered a severed hand while working on machinery. The incident occurred on 4 February 2021 and the injured worker was airlifted to Royal North Shore Hospital in Sydney for treatment. SafeWork NSW, the state workplace safety regulator, attended the site and opened an investigation into the accident, stating the inquiry could take several months to complete.

The wind farm, comprising 45 turbines, was under construction at the time, having been approved in 2018 with construction beginning in 2019. CWP Renewables, the site's owner, declined to comment on the incident when approached by media.

Not reported. The specific machinery involved and the circumstances leading to the amputation were not detailed in available reporting, and the regulatory investigation was ongoing at time of publication.

  1. Machinery guarding and isolation must be verified on every item of equipment during wind farm construction when multiple contractors work on site.
  2. Remote wind farm sites need pre-planned air ambulance access so an injured worker can reach specialist care quickly.

More lessons on worker safety and safe systems of work, from every incident on the register.

  • Specific machinery and failure mode
  • Downtime and repair cost
  • Investigation findings and recommendations

This entry is updated when these are reported. Get an alert for the next one like it.

Site page: Bango (status, dates and other incidents)

Published 2026-09-17. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Wind (onshore) incidents in Australia, by year, free with a credit (PNG).

Wind (onshore) incidents in Australia: 17 entries, with a free alert for the next one.

Wind turbine fires: the counts, the latest entries and a free alert for the next one.

Browse the full register or submit an incident.