Worker injured as GE wind turbine collapses in Maranhao, Brazil
Sept 2019Published 15 Sept 2026Responsible editor: Chief Editor
- Where
- Delta VI wind project, Maranhao, north-east Brazil
- Manufacturer
- GE
- What
- GE 2.72-116 wind turbine collapsed on 3 September 2019
- Injuries
- one worker injured, received medical treatment
- Cause
- Under investigation
Get the next one by email
Free alerts on wind (onshore) incidents in Brazil, and an email when EIR-0809 is updated. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Omega Energia
What happened
A GE 2.72-116 wind turbine collapsed at Omega Energia's Delta VI wind project in Maranhao, north-east Brazil, on 3 September 2019. Three GE employees were on site at the time of the collapse and one worker was injured, receiving medical treatment afterwards. GE Renewable Energy confirmed the incident and said it was working to determine the root cause. The collapse was the fifth involving GE turbines that year, following earlier collapses in New Mexico, Oklahoma, Nebraska and another site in Pernambuco, Brazil.
No injuries had been reported in the previous four incidents. GE stated it was too early to speculate on the cause of this latest collapse but said teams were in place to investigate and resolve the issue, drawing on lessons from the earlier failures, to ensure safe and reliable turbine operation across its fleet.
Contributing factors
The incident followed a pattern of four earlier GE turbine collapses in 2019, most involving the manufacturer's 2MW platform, though a specific root cause for the Brazil collapse had not been confirmed at the time of reporting.
Lessons learned
- Five GE turbine collapses in one year across sites call for fleet-wide structural checks rather than site-by-site fixes.
- Teams must draw on prior failure data quickly when a platform shows repeated collapses.
- Site access rules need review once a turbine model records multiple collapses in a short period.
More lessons on structural integrity and turbines, from every incident on the register.
Not yet known
- Root cause of the collapse
- Turbine age and service history
- Length of downtime
- Cost of repairs and lost output
This entry is updated when these are reported. Get an alert for the next one like it.
Site page: Delta 4 wind farm (status, dates and other incidents)
Published 2026-09-15. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.