← Back to the list
Wind (onshore)North AmericaEIR-0007

Vestas onshore wind turbine blade failures across US sites 2024

2024Published 1 May 2026Responsible editor: Chief Editor

Estimated damageEstimated by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersLow confidence
turbine out of service for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hiddenThe maker is named in 30 other entries (being named is not a finding of fault)
Where
onshore wind sites in the United States
Manufacturer
Vestas
What
three blade shatter or detach incidents
Injuries
None reported
Outcome
affected turbines taken out of service

Companies named in the reporting of this entry (being named is not a finding of fault): Vestas

During 2024, publicly available industry reporting described three separate incidents at onshore wind sites in the United States (multiple sites) involving Vestas turbines of the same type, the most recent in November 2024. In each case a blade shattered or detached, and in some cases there was also significant damage to the nacelle. No injuries or fatalities were reported in the public accounts. The sites were reported to have taken the affected turbines out of service.

The grouping of three similar failures within a single calendar year across one Vestas turbine fleet attracted industry and media attention. This entry records only the publicly observable pattern. Formal root cause findings for the individual incidents were not in the public domain at the time of writing.

No published investigation findings were available for any of the three incidents, so no contributing factor can be attributed from public information. For background only, general industry literature on blade and structural failures identifies recurring categories including latent manufacturing defects, loading beyond the design envelope during extreme weather, lightning strike damage that propagates during subsequent operation, tower or foundation defects, and control system anomalies permitting overspeed. None of these has been linked to the incidents described here.

  1. Three similar blade failures in one Vestas fleet in a year require fleet wide engineering review and inspection without waiting for separate reports.
  2. Record blade serial numbers and repair history per turbine so common factors can be found quickly after repeated events.
  3. Set exclusion zones and access controls where blade detachment is possible and confirm throw distance assumptions.

More lessons on structural integrity and turbines, from every incident on the register.

  • Root cause of each blade failure
  • Specific turbine model and age
  • Duration of turbine downtime
  • Cost of repairs and lost generation

This entry is updated when these are reported. Get an alert for the next one like it.

Published 2026-05-01. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Wind (onshore) incidents by year, free with a credit (PNG).

Wind turbine fires: the counts, the latest entries and a free alert for the next one. Also: wind turbine blade failures and wind turbine nacelle fires.

Browse the full register or submit an incident.