Around this site

← Back to Xinjiang

Onshore wind · China

Xinjiang Toli (Goldwind) Experimental wind farm

Under construction800 MWChecked 8 October 2026Last changed in the dataset 17 January 2026

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Xinjiang Toli (Goldwind) Experimental wind farm sets out every comparable incident for this project, with sources. Launch price: £145 until 31 October (normally £295). By email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
800 MW
Status
Under construction (Construction)
Operator
Tacheng Goldwind Tianrun Guochuang Experimental Wind Farm
Owner
Xijiang Goldwind Technology Co Ltd
Location
Tacheng Prefecture, Xinjiang, China
First operating
2026

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Xinjiang Toli (Goldwind) Experimental wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.